Phase 1 in progress

An industrial ambition broken into verifiable decisions.

Kayphas is not pursuing immediate vertical integration. Each phase must produce technical, commercial or institutional evidence before scale-up.

Three horizons, three decision gates.

Dates are working windows, not commercial commitments. They will be revised based on results, partners and financing.

01

In progress

Near term · 2026–2027

Validation and team

Turn an industrial thesis into a credible experimental programme.

  • Join one or two deeptech accelerators
  • Incorporate the selected structure
  • Recruit a technical co-founder or CTO
  • Secure CSPG, certificates of analysis and samples
  • Contract a laboratory and assemble the first cell
  • Conduct initial customer and partner interviews

Decision gate

Measured cell + technical team + material/lab access + first market signals.

02

Planned

Mid term · 2028–2030

Demonstration and pre-industrialization

Move from a laboratory cell to prototypes tailored to an initial application.

  • Select the first market based on interviews
  • Optimize formulation, interfaces and process
  • Progressively qualify Malagasy inputs
  • Secure LOIs, development agreements or a pilot contract
  • Separately assess the opportunity for a future solar programme
  • Establish feasibility, cost and permitting studies

Decision gate

Reproducible prototype + application partner + defensible preliminary economics.

03

Conditional vision

Long term · After 2030

Phased industrialization

Localize only those steps whose quality, demand and financing have been demonstrated.

  • Secure supply and offtake agreements
  • Finance a targeted first industrial capacity
  • Deploy only validated capabilities while separating incompatible processes
  • Develop skills and strengthen local suppliers
  • Expand products and markets after qualification
  • Assess space applications after mission qualification

Decision gate

Offtake + financing + permits + industrial quality + resilient supply chain.

What protects Kayphas from premature industrialization.

01

Evidence before scale

No industrial capability is presented as established before validation and financing.

02

Partnership before CAPEX

Kayphas initially uses qualified materials, laboratories and platforms.

03

Qualify before localizing

Geological availability does not equal battery-grade qualification.

04

One initial application

The chemistry may be shared; cells and systems remain application-specific.

05

Process separation

Any future solar programme will remain separate from incompatible battery processes.

06

Reversible decisions

Each phase has a decision gate before more capital is committed.

Assemble the ecosystem for the first proof.

An accelerator, CTO, CSPG supplier, laboratory and first discovery customers are the priority dependencies.